Evaluation of an Alternative Tunnel Support System to Build Shallow Metro Stations at Urban Areas

dc.contributor.authorNamli, Muecahit
dc.date.accessioned2025-11-16T19:34:18Z
dc.date.issued2025
dc.departmentİstanbul Medeniyet Üniversitesi
dc.description.abstractGround surface settlement is the most significant restriction when constructing shallow metro station tunnels in urban areas. The umbrella arch method (UAM) is generally applied as a tunnel support method. However, UAM becomes inadequate in some soil conditions, such as loose sand or soft clay. Innovative support systems are required to safely build shallow metro station tunnels in urban areas. The objective of this research is to investigate alternative tunnel support systems and appropriate soil models to safely construct shallow twin-tube metro station tunnels. The continuous pipe arch system (CPAS), which consists of horizontal and continuous pipes along the metro station tunnels, was modeled in three dimensions (3D) using the finite element (FE) program Plaxis3D for various pipe diameters. The ground surface settlement results of the 3D models were compared with the in situ settlement measurements to validate the geotechnical parameters of the soils used in the models. It was observed that the hardening soil (HS) model was more accurate than the Mohr-Coulomb (MC) soil model. As a result of the 3D FE model analysis, maximum ground surface settlements were obtained below 50 mm when the pipe diameters of CPAS were larger than an internal diameter (ID) of 1200 mm at a cover depth of 10 m in sandy clay soil. It is revealed that CPAS with pipe diameters between ID 1200 mm and ID 2000 mm can be utilized as a tunnel support system in urban areas to construct shallow twin-tube metro station tunnels with low damage risk.
dc.description.sponsorshipIstanbul Development Agency
dc.description.sponsorshipThe author thanks to mining engineer Onur Aras, and civil engineer & Idot;dris Araz and UEmit Enes Arat, the researchers of yupam research center (yupam.org) which was established by the support of Istanbul Development Agency, civil engineer Berk Demir the project engineer of metro project and all representatives of Istanbul Metropolitan Municipality (IMM) worked at UUCP project with Mehmet Zengin chief geotechnical engineer of the project.
dc.identifier.doi10.1155/adce/5588423
dc.identifier.issn1687-8086
dc.identifier.issn1687-8094
dc.identifier.issue1
dc.identifier.scopus2-s2.0-105006634865
dc.identifier.scopusqualityQ2
dc.identifier.urihttps://doi.org/10.1155/adce/5588423
dc.identifier.urihttps://hdl.handle.net/20.500.14730/15308
dc.identifier.volume2025
dc.identifier.wosWOS:001493176200001
dc.identifier.wosqualityN/A
dc.indekslendigikaynakWeb of Science
dc.indekslendigikaynakScopus
dc.language.isoen
dc.publisherWiley
dc.relation.ispartofAdvances In Civil Engineering
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı
dc.rightsinfo:eu-repo/semantics/openAccess
dc.snmzKA_WOS_20250302
dc.subject3D numerical model
dc.subjectcontinuous pipe arch system (CPAS)
dc.subjectfinite element model
dc.subjectground surface settlement
dc.subjectNew Austrian Tunneling Method (NATM)
dc.subjecttrenchless technology
dc.subjectumbrella arch method (UAM)
dc.titleEvaluation of an Alternative Tunnel Support System to Build Shallow Metro Stations at Urban Areas
dc.typeArticle

Dosyalar