Effect of changing methodology of tunnel final lining on the construction duration of a metro project
| dc.contributor.author | Namli, M. | |
| dc.contributor.author | Araz, I. | |
| dc.date.accessioned | 2025-05-10T15:21:38Z | |
| dc.date.issued | 2019 | |
| dc.department | İstanbul Medeniyet Üniversitesi | |
| dc.description | World Tunnel Congress, WTC 2019 and the 45th General Assembly of the International Tunnelling and Underground Space Association, ITA-AITES 2019 -- 3 May 2019 through 9 May 2019 -- Naples -- 226789 | |
| dc.description.abstract | Uskudar-Umraniye-Cekmekoy Metro Line (UUCM) is the second metro project located at the Asian side of Istanbul. In this paper, effect of changing construction methodology of final lining of tunnels on construction duration and cost of Cakmak Metro Station is analyzed. Concourse of Cakmak Station was built by cut and cover method. The rest of the station was tunnel and built by NATM. Conventional cast concrete was used for the final lining of tunnels. Changing the final lining (second-ary lining) of all tunnels in Cakmak Station from conventional cast concrete to sprayed concrete (shotcrete) is examined, since it was a very critical station in the middle of metro line. Based on our analysis, using shotcrete as final lining of tunnel instead of conventional cast concrete could give the opportunity to complete the Cakmak Station about 6 months earlier and with 15 % less cost. © 2019 Taylor & Francis Group, London. | |
| dc.identifier.doi | 10.1201/9780429424441-628 | |
| dc.identifier.endpage | 5951 | |
| dc.identifier.isbn | 978-113838865-9 | |
| dc.identifier.scopus | 2-s2.0-85068411439 | |
| dc.identifier.scopusquality | N/A | |
| dc.identifier.startpage | 5944 | |
| dc.identifier.uri | https://doi.org/10.1201/9780429424441-628 | |
| dc.identifier.uri | https://hdl.handle.net/20.500.14730/6096 | |
| dc.indekslendigikaynak | Scopus | |
| dc.language.iso | en | |
| dc.publisher | CRC Press/Balkema | |
| dc.relation.ispartof | Tunnels and Underground Cities: Engineering and Innovation meet Archaeology, Architecture and Art- Proceedings of the WTC 2019 ITA-AITES World Tunnel Congress | |
| dc.relation.publicationcategory | Konferans Öğesi - Uluslararası - Kurum Öğretim Elemanı | |
| dc.rights | info:eu-repo/semantics/closedAccess | |
| dc.snmz | KA_Scopus_20250302 | |
| dc.subject | Cost benefit analysis; Linings; Office buildings; Shotcreting; Subway stations; Tunneling (excavation); Tunnels; Construction duration; Construction methodology; Cut-and-cover method; Istanbul; Metro lines; Metro stations; Sprayed concrete; Concretes | |
| dc.title | Effect of changing methodology of tunnel final lining on the construction duration of a metro project | |
| dc.type | Conference Object |