A neural network for resource constrained project scheduling programming

Yükleniyor...
Küçük Resim

Tarih

Dergi Başlığı

Dergi ISSN

Cilt Başlığı

Yayıncı

Vilnius Gediminas Tech Univ

Erişim Hakkı

info:eu-repo/semantics/openAccess

Özet

The resource constrained project-scheduling problem (RCPSP) aims to minimize the duration of a project. RCPSP is prevalently used in programming the projects with high number of activities and resources such as construction projects. In this study, 240 projects such as residential, office, school, etc. are designed and programmed under limited resources. The resource amounts of these projects are determined using three priority rules, these are Latest Finish Time, Minimum Slack Time and Maximum Remaining Path Length which have the highest performance according to the literature, in the amounts of 2, 4, 6 and 8. The project times are estimated using artificial neural network (ANN). A correlation coefficient of 0.70 was obtained from the ANN estimation model.

Açıklama

Anahtar Kelimeler

construction project, project management, priority rules, resource constraints, artificial neural network

Kaynak

Journal of Civil Engineering and Management

WoS Q Değeri

Scopus Q Değeri

Cilt

21

Sayı

2

Künye

Onay

İnceleme

Ekleyen

Referans Veren